NOTICE AS TO ACTION TO INCREASE WATER AND SEWER SERVICE RATES FOR 2027
NOTICE IS HEREBY GIVEN that the Board of Directors of the WOODMOOR WATER AND SANITATION DISTRICT NO. 1 (the “District”) will be considering increasing domestic water service rates and sanitary sewer service rates for 2027. A copy of said rate increases is set forth below. Such action will be considered during a public hearing to be held at 1:30 P.M. during a special meeting of the Woodmoor Water and Sanitation District No. 1 on Monday, December 14, 2026. The meeting will be held at 1845 Woodmoor Drive, Monument, Colorado.
BY ORDER OF THE BOARD OF DIRECTORS:
WOODMOOR WATER AND SANITATION DISTRICT NO. 1
By: Jessie J Shaffer | District Manager
Post on: The District’s official web-site
Posted dates: November 12, 2026 through December 14, 2026
Rate Increases (see Attachment A and Attachment B below)
Attachment A - Water Rates and fees
WATER:
Potable Tap Fee:
| Tap Size, Inches | Tap Equivalent | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|---|
| 3/4" MF (1) | 0.75 | $33,791.00 | $37,170.00 |
| 3/4" | 1 | $45,055.00 | $49,560.00 |
| 1" | 1.78 | $80,198.00 | $88,217.00 |
| 1.5" | 4.01 | $180,670.00 | $198,736.00 |
| 2" | 7.11 | $320,340.00 | $352,372.00 |
| 2.5" | 11.3 | $509,120.00 | $560,028.00 |
| 3" | 16.03 | $722,230.00 | $794,447.00 |
| 4" | 28.44 | $1,281,361.00 | $1,409,486.00 |
| 6" | 64.23 | $2,893,876.00 | $3,183,239.00 |
(1)This tap size refers to multi-family dwelling units
Irregular Structure Tap Fee:
| Irregular Structure Tap Fee: | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| Per Water Supply Fixture Unit | $1,078.34 | $1,186.00 |
Non-Potable Tap Fee:
| Tap Size, Inches | Tap Equivalent | Existing 2025 Fee ($) | Proposed 2026 (Not to Exceed) |
|---|---|---|---|
| 2" | 7.11 | $149,103.00 | $164,013.00 |
| 2.5" | 11.3 | $236,972.00 | $260,669.00 |
| 3" | 16.03 | $336,164.00 | $369,780.00 |
| 4" | 28.44 | $596,414.00 | $656,055.00 |
| 6" | 64.23 | $1,346,964.00 | $1,481,660.00 |
Tap Application Fees:
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| Inspection Fee | $200.00 | $250.00 |
| Equipment Fee | $650.00 | $650.00 |
Hydrant Permit Fees:
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| Permit Fee | $50.00 | $50.00 |
| Per Week of Use | $25.00 | $25.00 |
| Equipment Deposit (Refundable) | $4,500.00 | $4,500.00 |
| Hydrant Deposit (Refundable) | $5,000.00 | $5,000.00 |
Supplemental Water Service Fees:
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| Base Rate (Per Acre-Foot) | $34,500.00 | $34,500.00 |
Augmentation Water Service Fees:
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| In District (Per Acre-Foot) | $2,450.00 | $2,597.00 |
Engineering Fees:
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| Plan Review Fee (per hour) | $100.00 | $100.00 |
| Field Observation/Inspection Fee (per hour) | $120.00 | $120.00 |
Water Base Fees:
| Meter Size, inches | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| ¾ | $12.37 | $13.11 |
| 1 | $30.95 | $32.81 |
| 1.5 | $61.88 | $65.59 |
| 2 | $99.00 | $104.94 |
| 2.5 | $148.49 | $157.40 |
| 3 | $198.00 | $209.88 |
Water Volume Charge, $ per 1,000 gallons used in a month:
*Note: All Blocks Expanded by Meter Equivalents (except GID Blocks)
| Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) | |
|---|---|---|
| Residential | ||
| Block 1 - 0 to 6,000 | $7.85 | $8.32 |
| Block 2 - 6,001 to 25,000 | $12.66 | $13.42 |
| Block 3 - Over 25,000 | $20.67 | $21.91 |
| Nonresidential | ||
| All usage | $10.07 | $10.67 |
| Irrigation Only (Using MGID) | ||
| Block 1 - 80% MGID | $12.88 | $13.65 |
| Block 2 - Next 20% MGID | $20.53 | $21.76 |
| Block 3 - Over 100% MGID | $21.30 | $22.58 |
| Irrigation Only (Not using MGID) | ||
| Block 1 - 0 to 6,000 | $8.24 | $8.73 |
| Block 2 - 6,001 to 25,000 | $13.56 | $14.37 |
| Block 3 - Over 25,000 | $21.65 | $22.95 |
| Bulk | ||
| Block 1 - 0 to 6,000 | $8.24 | $8.73 |
| Block 2 - 6,001 to 25,000 | $13.56 | $14.37 |
| Block 3 - Over 25,000 | $21.65 | $22.95 |
| Bulk Irrigation | ||
| Block 1 - 80% MGID | $8.24 | $8.73 |
| Block 2 - Next 20% MGID | $13.56 | $14.37 |
| Block 3 - Over 100% MGID | $21.65 | $22.95 |
| Non-Potable Irrigation | ||
| Block 1 - 80% GID | $4.54 | $4.81 |
| Block 2 - Next 20% GID | $7.07 | $7.49 |
| Block 3 - Over 100% GID | $12.36 | $13.10 |
Renewable Water Investment Fee (per Mo.):
| Tap Size, Inches | Tap Equivalent | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|---|
| ¾" MF | 0.75 | $30.00 | $30.00 |
| ¾" | 1 | $40.00 | $40.00 |
| 1" | 1.78 | $71.20 | $71.20 |
| 1 ¼" | 2.79 | $111.60 | $111.60 |
| 1 ½" | 4.01 | $160.40 | $160.40 |
| 2" | 7.11 | $284.40 | $284.40 |
| 2 ½" | 11.3 | $452.00 | $452.00 |
| 3" | 16.03 | $641.20 | $641.20 |
| 4" | 28.44 | $1,137.60 | $1,137.60 |
Attachment B - Sewer Rates and fees
Sewer:
| Base Sewer Charge, $ per month | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| Residential | $39.35 | $40.92 |
| Non-Residential | $39.35 | $40.92 |
| Sewer Volume Charge, per 1,000 gallons | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| Non-Residential | ||
| Block 1 - 0 to 6,000 | $0.00 | $0.00 |
| Block 2 - Over 6,000 | $5.13 | $5.34 |
| Sewer Tap Fee: | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| First 25 fixture units (minimum) | $10,700.00 | $11,128.00 |
| Each additional fixture unit | $428.00 | $445.12 |
| Irregular Structure Sewer Tap Fee: | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| Per drainage fixture unit | $428.00 | $445.12 |
| Tap Application Fees: | Existing 2025 Fee ($) | 2026 Fee ($) (Not to Exceed) |
|---|---|---|
| Inspection Fee | $200.00 | $200.00 |
